Getting Your Kitchen Extension Right First Time
Kitchen extensions can transform how your family lives. We've seen single-storey rear extensions turn cramped galley kitchens into proper family spaces where everyone wants to spend time.
But get the planning wrong, and you'll end up with delays, extra costs, and possibly having to rebuild work that doesn't comply. We've been through this process dozens of times with Nottingham families, so we know what works and what doesn't.
The key thing to understand is that there are actually two different approval processes you might need. Planning permission decides what you can build and where. Building regulations control how you build it safely. Sometimes you need both, sometimes just one, occasionally neither.
When You Actually Need Planning Permission
The Permitted Development Limits
Most single-storey rear extensions don't need planning permission if they stay within something called "permitted development rights." These are quite generous in Nottingham, but there are specific limits you can't exceed.
For terraced houses (and there are loads of them in Nottingham), you can extend up to 6 metres from the back of the original house. For semi-detached and detached houses, it's 8 metres. But there are other rules too.
The extension can't be higher than 4 metres at the highest point, or 3 metres if it's within 2 metres of a boundary. And it can't cover more than half your original garden area.
The family on Sherwood Road thought they were fine with a 5-metre extension on their terraced house. Except their house backed onto a conservation area, which removes permitted development rights completely. They needed full planning permission, which added 2 months to their timeline.
When You Definitely Need Planning Permission
Two-storey extensions always need planning permission. No exceptions. Side return extensions on terraced houses usually need permission too, even if they're single storey.
Any extension that changes the front elevation or the roof line needs permission. Changes in conservation areas like The Park or Lace Market always need permission, even for work that would normally be permitted development.
And if your house is listed - even Grade II listed - you'll need listed building consent as well as planning permission for any significant internal changes.
The Neighbour Consultation Process
Even for permitted development, you might need to go through neighbour consultation. This applies to larger single-storey extensions - anything over 3 metres for terraced houses or 6 metres for semi-detached houses.
You serve notice on your immediate neighbours, and they have 21 days to object. If they do object, the council decides whether to allow the extension or require a full planning application.
The Patel family in West Bridgford went through this process for their 5-metre extension. One neighbour objected about loss of light, but the council's planning officer came out, had a look, and decided the extension was reasonable. Added 6 weeks to the process, but much quicker than full planning permission.
The Planning Application Process
Pre-Application Advice
For anything complex or in a sensitive location, pre-application advice is worth the £150 fee. You submit outline plans and get feedback from the planning team before spending money on detailed drawings.
We always recommend this for extensions in conservation areas, near listed buildings, or where there might be any uncertainty about policy. Better to find out early if there are problems than submit an application that gets refused.
What Drawings You Need
A planning application needs proper drawings, not sketches on the back of an envelope. You'll need existing and proposed floor plans, elevations showing how the extension looks from outside, and a site location plan.
The drawings need to be to scale and show key dimensions. For kitchen extensions, you usually need to show the relationship to neighbouring properties too, especially windows and how the extension might affect their light.
We work with a good local architect who understands Nottingham planning requirements. His drawings get approved for the first time because he knows what the planning team wants to see.
The 8-Week Determination Period
Once your application is submitted, the council has 8 weeks to make a decision. In practice, it's often quicker for straightforward applications, sometimes longer if there are complications.
If your neighbours object, or if the application needs to go to the planning committee, it can take longer. Applications in conservation areas sometimes need extra consultation time too.
The Smith family in Arnold submitted their application in January and got approval in 6 weeks. Simple single-storey extension, no objections, and good quality drawings that showed everything clearly.
Dealing with Neighbour Objections
Not all objections are reasonable, but some raise genuine planning issues. Loss of light, loss of privacy, impact on the character of the area - these are things the planning team will consider seriously.
Good design can address many concerns. Lower roof lines, different materials, or repositioning windows can often solve problems without compromising what you want to achieve.
The family on Carlton Road faced objections about their proposed extension being too dominant. Working with the architect, we redesigned it with a lower pitch roof and used matching brick to the original house. Objections withdrawn, permission granted.
Building Regulations - Always Required
What Building Regs Actually Cover
Even if you don't need planning permission, you'll almost certainly need building regulations approval for a kitchen extension. This covers structural safety, insulation, drainage, electrical work - all the technical stuff.
Building Control fees vary depending on the size and complexity of the extension, but budget around £500-1200 for a typical single-storey kitchen extension. Much better value than having to rebuild work that doesn't comply.
The Inspection Process
Building Control wants to see the work at key stages. Foundation inspection before you pour concrete. Damp course and insulation checks before you close up the walls. Final inspection before you can get your completion certificate.
Book inspections in advance - they need at least 2 days notice, and if they can't get out when you need them, your work stops until they can.
Our builder always books inspections early and has backup dates. Keeps the project moving and avoids expensive delays.
Structural Calculations
Most kitchen extensions need structural calculations for the foundations and any new openings between the extension and existing house. You can't just guess - Building Control want to see proper engineer's calculations.
We work with a local structural engineer who knows Nottingham's ground conditions and typical house construction. His calculations get approved quickly because Building Control know his work.
Nottingham-Specific Considerations
Conservation Areas
Large parts of Nottingham are covered by conservation area designations. The Park, Lace Market, parts of Sherwood - each has its own character that planning policy tries to protect.
In conservation areas, permitted development rights are more limited. Materials matter more - you'll need to use traditional bricks and roof tiles. Design needs to respect the character of the area.
The family near Nottingham Contemporary wanted a very modern extension with lots of glass. In a conservation area, that wasn't going to get approved. We redesigned using traditional proportions and materials but with larger windows to give the light they wanted.
Archaeological Considerations
Parts of central Nottingham have archaeological significance. If you're digging foundations near the old city centre, there might be requirements for archaeological watching briefs or even proper excavation.
This is more common than you'd think. Roman and medieval Nottingham covered quite a large area, and significant finds can stop work while proper investigation happens.
Drainage and Flood Risk
Parts of Nottingham near the River Trent are in flood risk areas. This can affect foundation design and means sustainable drainage might be required for new hard surfaces.
Building Control will want to see how surface water from new roofs and paved areas will be managed. Sometimes this means soakaways, sometimes connection to existing drains.
Parking Requirements
In some parts of Nottingham, planning policy requires off-street parking spaces to be maintained. If your extension reduces parking, you might need to show how this will be replaced.
This caught out the family on Derby Road. Their side return extension removed access to their garage, reducing parking from 2 spaces to 1. Planning was only approved when they showed how the front garden could be converted to provide replacement parking.
Working with Nottingham City Council
The Planning Team
We've built good relationships with Nottingham's planning team over the years. They're generally helpful and want to approve applications that comply with policy.
Early discussion often helps. If you're unsure about something, phone and ask. Much better than submitting an application that has problems.
Building Control Services
Nottingham City Council provides Building Control services, but you can also use approved private inspectors. We usually stick with the council service - they know local conditions and typical construction methods.
Their inspectors are thorough but reasonable. If there's a problem, they'll explain what needs doing and why. Much better to get it right than try to cut corners.
Timeline Expectations
Planning applications: 8 weeks for householder applications, longer if complications Building Control applications: 5 weeks to check plans, then inspections as work progresses Listed building consent: 8 weeks, but often longer due to consultation requirements
Building these timelines into your project planning avoids disappointment and keeps everything on track.
Common Mistakes That Cost Money
Starting Work Before Approvals
We've seen people start digging foundations before Building Control approval comes through. Big mistake if the plans need changes - you might have to dig them out and start again.
Wait for all approvals before starting work. Yes, it's frustrating when the weather's good and the builder's available, but doing it wrong costs much more than waiting.
Assuming Permitted Development Applies
Don't assume your extension falls under permitted development without checking properly. Conservation areas, listed buildings, previous extensions, and planning conditions can all remove or limit permitted development rights.
The family in Mapperley assumed their 4-metre extension was permitted development. Turned out a previous extension in the 1980s had already used up some of their allowance. Needed full planning permission and 3 months delay.
Poor Quality Applications
Cheap drawings often mean refused applications. Planning officers need to see clearly what you're proposing and how it relates to neighbouring properties.
False economy to save £500 on drawings if it means your application gets refused and you have to start again.
Ignoring Neighbour Concerns
Talk to your neighbours before submitting applications. Often you can address concerns early and avoid formal objections that delay the process.
The family on Forest Road spent time explaining their plans to neighbours and showing how they'd addressed potential privacy issues. No objections, quick approval.
How We Support the Process
Initial Feasibility Assessment
Before customers spend money on applications, we assess what's actually possible on their site. Check permitted development rights, look for potential problems, give realistic timelines.
Working with Planning Consultants
For complex applications, we work with planning consultants who know Nottingham's planning policies. They can navigate requirements and present applications in the best possible way.
Coordinating with Building Control
We schedule Building Control inspections to fit with construction timelines. Our builder knows what they need to see at each stage and prepares accordingly.
Managing Customer Expectations
Planning and Building Control processes take time. We explain the timelines upfront and keep customers updated on progress. Better to overestimate timescales than create unrealistic expectations.
The planning and building control process might seem daunting, but it's there for good reasons. Following the proper procedures protects you, your neighbours, and ensures your extension is built safely and legally.
We've guided dozens of Nottingham families through this process. With proper planning and realistic timelines, you can navigate the requirements and end up with a kitchen extension that transforms how your family lives.
Planning a kitchen extension in Nottingham? Call us on 0115-824-4201 for a free feasibility assessment. We'll identify what approvals you need and realistic timelines.