Wondering how long a kitchen renovation actually takes once the work starts, and what happens in the gaps between the visible jobs, is one of the first questions most Nottingham homeowners ask before committing to a project. A straightforward replacement usually runs 4-5 weeks once materials are on site, but the real planning starts before that, in the lead time for units, stone worktops, and any planning or building control approval an extension might need. This page breaks the process down stage by stage, from the first measure-up through strip-out, first and second fix, and final snagging, so you can see roughly what's happening in your house each week rather than guessing.

Older Nottingham properties add their own wrinkle to that schedule - a Victorian terrace in the Lace Market or a period house near the Castle can hide an out-of-square wall or an uneven floor that only shows up once the old units are stripped out, which is why buffer time gets built into the plan rather than promised away to win a shorter-sounding quote.

What's Covered at Each Stage, From Strip-Out to Handover

  • Initial consultation, measuring and CAD/interactive floor-planning design, so you see the kitchen before committing to it
  • Material selection at our partner showroom, Kudos Kitchens, where doors and worktops look properly under real lighting rather than on a phone screen
  • Strip-out and removal of the old kitchen, including skip arrangements, under our registered waste carrier licence
  • First and second fix electrics, plumbing, and any replastering needed around chased walls, carried out by our own qualified trades
  • Base, wall and tall unit installation, worktop templating and fitting in stone or laminate, and appliance connection with gas safety and electrical certification
  • Tiling and splashbacks, hardware fitting, final snagging, a handover demonstration, and your written installation warranty

Not Included / Costed Separately

  • Structural alterations such as removing walls or fitting steel beams - these get surveyed and priced separately once we know what's actually holding the room up
  • Planning permission and building control applications for extensions - we arrange them where needed, but the approval process (8 weeks minimum) and any associated fees sit outside the core kitchen contract
  • Redecoration of hallways, dining rooms or other areas disrupted by dust - we protect them with dust sheets and barriers, we don't repaint them
  • Alternative cooking facilities during the works - most families set up their own temporary spot with a microwave, kettle and portable hob in a utility room, dining room or conservatory

Week by Week: How the Renovation Actually Unfolds

  1. Before the strip-out starts (design and ordering) -- Measure-up, CAD/interactive floor-planning and material selection happen first, followed by a written agreement and order of units, appliances and any stone worktop. This stage isn't part of the on-site weeks below, but it sets them - stone worktops in particular need to be ordered early because the slab has to be cut to a template taken later, once units are fixed.
  2. Week 1 - strip-out -- The old kitchen comes out, including sink, units and often flooring, with skip and waste removal handled under our registered waste carrier licence. This is when a wall that isn't as solid as it looks, or a floor that isn't level, tends to show up on older properties - it gets surveyed and talked through with you before anything else proceeds.
  3. Week 2 - first fix electrics and plumbing -- Wiring and pipework are routed to match the new layout, sockets and lighting positions are chased into walls, and any replastering needed around that chasing is carried out before units go anywhere near the room.
  4. Week 3 - units go in and worktops get templated -- Base, wall and tall cabinets are fixed in place first. Stone worktop templating can only happen once the units are physically fixed, since the template has to match the room as built, not the original drawing - laminate worktops can usually be cut and fitted the same week.
  5. Week 4 - second fix and worktop fitting -- Stone or laminate worktop is fitted, appliances are connected and commissioned - gas hobs and ranges by a Gas Safe registered engineer, electrical connections by a Part P approved installer - and tiling or splashbacks go up.
  6. Week 5 - snagging and handover -- Hardware is fitted, a formal snagging pass checks doors, drawers and finishes before we call the job done, and you get a handover demonstration plus your written installation warranty.

Budgeting for a Renovation on This Timeline

Kitchens through us start from around £5,000 for a full design, supply and installation package, though the actual figure depends on the size of the room, the units and worktop you choose, and whether any structural or electrical upgrading is needed on top of the standard first and second fix work described above. Stone worktops cost more than laminate but come with a much longer warranty, and any wall removal or steel beam work only gets priced once we've confirmed what's involved - that's part of why the planning phase matters as much as the installation weeks. If spreading the cost suits you better, flexible finance is available through an FCA-regulated partner, subject to status. None of this replaces a proper figure for your own kitchen: a free, no-obligation home visit gets you a full written quotation with no hidden extras added later, once we've actually seen the space and talked through the timeline that fits it.

How a Managed Timeline Compares to the Alternatives

What matters during the renovation Nottingham Kitchen Fitter General builder using subcontracted trades DIY or flat-pack kitchen
Trade coordination One team manages joiners, plumbers, electricians, gas engineers and plasterers to the schedule above You or the builder juggle separate tradespeople, which is where a lot of delays creep in You book and coordinate every trade yourself
Gas and electrical certification Gas Safe registered engineers and Part P approved electricians, with certificates provided at handover Varies by builder - always worth checking credentials directly You source and pay for certified tradespeople separately
Design visualisation before ordering CAD and interactive floor-planning so you see the layout before committing Not usually offered Limited to standard catalogue images
Warranty on completion 5-year guarantee on labour and installation, 2-year on products Depends entirely on the individual builder Manufacturer warranty on units only - no installation guarantee
Typical timeline for a straightforward replacement 4-5 weeks, communicated up front with buffer for lead times Variable, often stretched by scheduling gaps between separate trades Can run to months around other commitments

What 800+ Nottingham Kitchens Has Taught Us About Getting the Timeline Right

Running over 800 kitchen installations across Nottingham has shown us where renovation schedules actually go wrong, and it's rarely the fitting week itself. Victorian terraces in areas like the Lace Market and The Park often hide a wall that isn't as solid as it looks once the old plaster comes off, so a survey and contingency day gets built into any job on an older property before we quote a finish date, rather than being added on as a delay once we're already inside. Stone worktop templating can only happen once units are fixed in place, which is why quartz and granite jobs get flagged for longer lead times at the first site visit instead of surfacing as a surprise partway through. Because the same core team handles carpentry, plumbing, electrics and gas connection on every project, we schedule first and second fix in the order that's proven to work over two decades of jobs - the plasterer only goes in once chased walls are signed off, and gas commissioning is booked once the hob or range is physically on site, not before. That pattern, repeated across 800-plus kitchens, is what the week-by-week timeline on this page is built from, not a generic project template.

Where This Timeline Applies - Nottingham and the Wider East Midlands

We're based in Nottingham and work from a dedicated regional workshop, so the timeline above holds whether you're in the city itself - the Victorian terraces of The Park and Carlton mentioned earlier are typical examples of the older properties that need extra checking - or further out in West Bridgford, Wollaton, Beeston, Arnold and Sneinton. We also cover Nottinghamshire towns including Mansfield, Kirkby-in-Ashfield and Stapleford, and reach into Derbyshire as far as Derby, Long Eaton, Alfreton and Heanor, roughly a 15-20 mile radius that extends to Chesterfield and the Derbyshire border. Properties nearer Nottingham Castle and the older, sandstone-founded parts of the city tend to have the uneven floors and out-of-square walls we mentioned under hidden problems, so we build extra survey and levelling time into jobs in those conservation areas. Homes along the NET tram corridor through Beeston and Clifton are just as straightforward for us to reach with a full team and equipment as anywhere closer to the workshop.

Renovation Timeline Questions We Get Asked

How far ahead should I book if I want work to start on a particular date?

Book as early as you can once you've decided to go ahead, especially if you like the sound of stone worktops or your kitchen involves any structural work. Standard units are usually 2-3 weeks after final approval, stone worktops can run to 4-6 weeks in busy periods, and if planning permission is needed for an extension, that process takes 8 weeks minimum on its own. None of that includes the initial design and consultation stage, so a few months' notice gives you the most flexibility over your actual start date.

Do I have to move out while the kitchen's being fitted?

Most of the families we work with stay in the house. You'll be without a working kitchen sink and cooking facilities for most of the 4-5 weeks, so it helps to set up a temporary spot with a microwave, kettle and portable hob in a dining room, utility room or even a conservatory. If you're having a larger extension with significant structural work, it's worth talking to us about whether staying put makes sense for your household - some families plan around it, others find a short stay elsewhere easier.

What happens if you find a problem once the old kitchen's stripped out?

Older Nottingham houses sometimes hide things a survey can't catch until the units are out - rotten joists, a wall that's not as sound as it looks, wiring that needs upgrading. If we find something like that, we stop and talk it through with you before doing anything extra, so you're not presented with a bill for work you didn't agree to. It's one of the reasons we build buffer time into the schedule rather than promising a date we can't guarantee.

Do I need planning permission for a kitchen renovation?

A straightforward like-for-like kitchen replacement usually doesn't need planning permission. Extensions are different - most need planning permission and always need building control approval, even where planning permission itself isn't required. That approval process takes 8 weeks minimum, so it's worth having that conversation with us before you order any materials.

Can the timeline be sped up if I'm in a hurry?

Some of it, yes - choosing units and worktops that are readily available rather than a long-lead-time stone finish, and avoiding structural changes, are the two biggest things that shorten the schedule. What we won't do is rush the base unit installation or worktop templating stage, because that's where mistakes get locked in permanently once stone worktops are cut. A realistic fast turnaround for a straightforward replacement is still around 4-5 weeks once materials are on site.

Why does the worktop only get templated after the units are fitted, not before?

A worktop template has to match the room as it's actually been built, not the original drawing - even a few millimetres out on a run of units changes where a stone joint or sink cutout needs to sit. That's why week 3 in the timeline above has units going in first, then templating, then the stone being cut off-site before it's fitted in week 4.

What's covered if something's not right after you've finished?

Our installation work carries a 5-year guarantee on labour and installation and a 2-year guarantee on products, on top of whatever the manufacturer offers - cabinet hardware and stone worktops often carry their own separate warranties running well beyond that. We also do a formal snagging pass before handover, so a sticking drawer or a door that's not quite level gets sorted before we call the job finished, not left for you to chase up afterwards.

Do you supply the appliances, or do I need to buy my own first?

We can supply and fit appliances as part of the project, or connect ones you've already bought - both work fine. If you're buying your own, let us know the exact models at the design stage so the housings and integration panels get sized correctly; a last-minute appliance swap is one of the more common causes of a fiddly final fit.

Why does the worktop only get templated after the units are fitted, not before?

A worktop template has to match the room as it's actually been built, not the original drawing - even a few millimetres out on a run of units changes where a stone joint or sink cutout needs to sit. That's why week 3 in the timeline above has units going in first, then templating, then the stone being cut off-site before it's fitted in week 4.

What's covered if something's not right after you've finished?

Our installation work carries a 5-year guarantee on labour and installation and a 2-year guarantee on products, on top of whatever the manufacturer offers - cabinet hardware and stone worktops often carry their own separate warranties running well beyond that. We also do a formal snagging pass before handover, so a sticking drawer or a door that's not quite level gets sorted before we call the job finished, not left for you to chase up afterwards.

Do you supply the appliances, or do I need to buy my own first?

We can supply and fit appliances as part of the project, or connect ones you've already bought - both work fine. If you're buying your own, let us know the exact models at the design stage so the housings and integration panels get sized correctly; a last-minute appliance swap is one of the more common causes of a fiddly final fit.

Get a Realistic Start Date, Not a Guess

The single biggest thing that pins down when your renovation can actually start is lead time - stone worktops, planning permission and material ordering all take longer than the installation itself. Booking your design consultation early means we can plan around those lead times properly instead of you waiting on a supplier at the last minute. Get in touch for a free, no-obligation home visit and a written timeline built around your own kitchen, not a generic one.

Nottingham Kitchen Fitter
Call 0115-647-4643

Family-Run Business  •  800+ completed kitchens  •  5-Year Guarantee

Quick Free Estimate - No Obligation

Fully Insured • Response within 15 mins

🔒 Your details are safe with us. No spam, ever.